University of Pennsylvania Chilled Water Facility

Is this your business?
Verify your details, earn a verified badge, and start getting customer inquiries. Takes about a minute by phone.
Claim This Business FreeClaiming is free. Featured placement is optional, $99/mo.
About University of Pennsylvania Chilled Water Facility
The University of Pennsylvania Chilled Water Facility in Philadelphia maintains the campus centralized cooling infrastructure that distributes chilled water through underground mains to buildings across the Penn campus. With a 4.6-star rating from 29 reviews, this industrial plant operates as a utility facility rather than a traditional HVAC contractor serving residential or commercial clients directly. The facility falls under the Facilities and Real Estate Services department, managing one of the three main utility distributions for the campus alongside steam and electric power.
The Operations Control Center uses a SCADA system to monitor and control critical equipment including HVAC systems, chiller plants, electrical substations, lighting, and space conditions throughout the campus. The system triggers text message alerts when conditions fall outside operating parameters, allowing staff to adjust systems accordingly. The two major chiller plants designated as MOD 7 and MOD handle air conditioning for the entire university campus, delivering chilled water at approximately 42 F through underground piping to achieve greater efficiencies than individual building systems.
Reviewers describe the facility in unusually reverent terms, with one noting a technician explained energy management principles during a tour of the control room altar. Another reviewer mentions the friendly maintenance engineers who welcomed visitors with explanations of optimizing flow rates and minimizing utility costs. The facility appears to offer tours that reviewers characterize as meditative experiences within the cathedral-like interior framed by stainless steel piping.
What Customers Say
All 29 reviewers award 4 or 5 stars, with multiple mentioning the meditative atmosphere and staff who provide educational tours. No negative reviews appear in the dataset.
Services
Campus Chilled Water Distribution
Centralized cooling system pumping chilled water through underground mains to campus buildings for air conditioning.
Steam Distribution System
Approximately 7 miles of underground pipeline ranging from 2-inch to 12-inch pipe delivering campus steam.
Utility Monitoring & Control
SCADA system monitoring critical equipment including HVAC, chillers, electrical, lighting, and space conditions.
Operations Control Center
Centralized location at Left Bank regulating utility distribution across the entire Penn campus.
Energy Management
Systems and procedures for optimizing utility consumption and reducing operational costs.
Steam Trap Testing
Program identifying and repairing defective steam traps to reduce lost steam costs.
Insulation Renewal Projects
Infrastructure maintenance identifying and replacing defective insulation to reduce system line losses.